Warehouse Factory, Jebel Ali Industrial First, Dubai
Jebel Ali North Free Zone
The building is designed and built with modern business needs in mind with premium finishes and top safety standards. Located in Jebel Ali Industrial Area I near Crystal Mall. Warehouse Area: 2,776.34 sqft. Office Area: 408.45 sqft. Service Area: 961.05 sqft. Height: 10-12 meters. Power: 800 KW. Two overhead cranes with a total capacity of 10 tons each.
基本详情
房产登记号 | 646807 |
---|---|
销售价格 | AED 14,000,000 (¥27,544,986) |
类型 | 仓库, 生产设施, 工作空间 , 物流场所 |
楼层 | 2 |
商业房产楼层 | 2 |
总面积 | 3866.3 平方米 |
区域描述 | Smartly built industrial space suitable for any industrial or logistical purpose. The property is designed and built with modern business requirements in mind and is in close proximity to malls, supermarkets, restaurants, and staff accommodations. The land belongs to Dubai Real Estate Corporation (Government of Dubai) and the annual rent is approximately AED 150,000 with VAT. |
测量结果已核验 | 是 |
测量结果基于 | 建设设计图 |
条件 | 新建 |
新建工程 | 是 |
特点 | 电梯, 计算机网络, 电流, 提升门, 货运电梯, 带分油器的地漏, 高门 , 房间自来水, 门厅, 开放式办公室, 路边装卸区, 室内装卸区 |
描述 | 3866.33 Square Meters of Built-Up Area |
附加信息 | For more information, to reserve this property, or to schedule a site visit, please do not hesitate to contact us |
建筑物和房产详细信息
建造已开始 | 2020 |
---|---|
建设年份 | 2022 |
落成典礼 | 2022 |
地板 | 2 |
电梯 | 否 |
屋顶类型 | 平屋顶 |
通风 | 机械抽气通风 |
地基 | 混凝土 |
能源证书类别 | 能源证书不是強制要求的 |
建筑材料 | 砖块, 混凝土 |
屋顶材料 | 薄钢板 |
立面材料 | 混凝土, 薄钢板 |
公共区域 | 设备存储, 储藏室, 技工室, 大堂 |
地块地区 | 3866.3 平方米 |
停车场数量 | 10 |
建筑物数量 | 1 |
地形 | 平地 |
道路 | 是 |
土地所有权 | 租赁 |
土地所有人 | Dubai Real Estate Corporation (Government of Dubai) |
每年租金 | 150,000 ¥ |
租赁合同结束 | 2020年7月1日 |
规划情况 |
详图
In the case of acquiring the land for rent, the percentage of construction is determined according to the use indicated in the lease contract |
建筑物产权 |
4146 平方米
The construction percentage must not be less than 30% of the land area for warehouses, and not less than 35% for factories, and not less than 10% and not more than 50% for workshops and contracting sites, and not less than 10% and not more than 30% other |
市政工程 | 水, 下水道, 电力, 燃气 |
服务
购物中心 |
0.2 公里, Al Salem Mall https://nicelocal.ae/dubai/mall/al_salem_mall |
---|---|
杂货店 |
0.2 公里, Shams Al Madina Supermarket https://www.facebook.com/shamsalmadinasalemmall/ |
医院 |
19.2 公里, Prime Medical Center http://shorturl.at/tzHN1 |
餐厅 |
0.1 公里, Khan City Restaurant https://emiratesbz.com/dubai/khan-city-restaurant-53740 |
公共交通接驳
地铁 |
7.5 公里, Danube Metro Station https://www.dubai-online.com/metrostations/danube/ |
---|---|
公共汽车 |
0.1 公里, Jebel Ali Industrial Area, Etisalat Tower 2 Bus Stop https://www.rta.ae/wps/portal/rta/ae/home?lang=ar |
机场 |
20.3 公里, Al Maktoum International Airport https://www.dubaiairports.ae |
轮渡 |
14.7 公里, Dubai Ferry Station https://www.dubai-ferry.com |
费用
房产税 |
150,000 د.إ / 年份 (295,124.85 ¥)
Lease payable to Dubai Real Estate Corporation (Government of Dubai). |
---|
购买成本
佣金 |
2 %
For realty services rendered for the sale and purchase of the property plus 5% VAT. |
---|---|
转让税 |
AED 580 (¥1,141) (估算) Transfer the ownership of a property from one entity to another or from a person to an entity (or vice versa) according to official government letters. |
这就是您开始购买房产的方式
- 填写简短表格,我们将安排会面
- 我们的经纪人将立即与您联系并安排会面
您想知道更多有关此房产的信息吗?
谢谢您的联系请求。 我们会及时与您联系!