Menyu Menyu
Funga , karibu

Tafutabkwa kutumia namba ya rufaa

Kondomu, Haapasaarentie 11

00960 Helsinki, Vuosaari

Tafadhali wasiliana na mwakilishi wa mauzo kwa maelezo zaidi juu ya mali hii.

Sari Markkanen

English Finnish
Wakala wa mali isiyohamishika
Habita Helsinki
Uhitimu wa mali isiyohamishika ya Kifini.
Ada ya kukodi
780 € / mwezi (2,320,567 TSh)
Vyumba
2
Vyumba vya kulala
1
Bafu
1
Mahali pa kuishi
47 m²

Wasiliana nasi

Jaza ombi la kukodisha mali hii mapema.

Ninavutiwa na kukodisha mali hii

Tuma ombi la kukodisha

Asante kwa ombi lako la kuwasiliana. Tutawasiliana nawe mara moja!

Maelezo ya kimsingi

Namba ya kuorodhesha 677908
Ada ya kukodi 780 € / mwezi (2,320,567 TSh)
Muda wa mkataba Isiyo na mwisho
Amana € 1,580 (TSh 4,700,635)
Kuvuta sigara inakubalika Hapana
Peti zinaruhusiwa Ndio
Vyumba 2
Vyumba vya kulala 1
Bafu 1
Bafu pamoja na choo 1
Mahali pa kuishi 47 m²
Vipimo vimehalalishwa Hapana
Vipimo vimepimwa na Cheti cha meneja wa nyumba
Sakafu 2
Sakafu za makazi 1
Hali Nzuri
Nafasi kutoka kwa 1 Nov 2026
Pa kuegeza gari Nafasi ya kuegesha gari , Maegesho ya ua, Nafasi ya kuegesha gari yenye kutumia umeme, Karakana, Pahali pa kuegesha gari mtaani
Nafasi Chumba cha kulala
Sebule
Sehemu ya jikoni
Bafu
Roshani
Mitizamo Ua, Ujirani
Hifadhi Kabati , Chumba cha msingi cha uhifadhi, Hifadhi ya dari
Mawasiliano ya simu Runinga ya kebol, Mtandao wa kebol
Nyuso za sakafu Lamoni
Nyuso za ukuta Karatasi ya ukuta, Rangi
Nyuso za bafu Taili
Vifaa vya jikoni Stovu ya kauri, Jokofu la friza, Kabati, Hudi la jikoni
Vifaa vya bafu Shawa, Kiunganishi cha mashine ya kuosha , Nafasi ya mashine ya kuosha, Shawa ya bidet, Sinki, Kiti cha msalani, Kabati yenye kioo

Maelezo ya ujenzi na mali

Mwaka wa ujenzi 1965
Uzinduzi 1965
Sakafu 3
Lifti Ndio
Aina ya paa Paa la gable
Uingizaji hewa Uingizaji hewa wa asili
Darasa la cheti cha nishati D , 2018
Kutia joto Kutia joto kwa wilaya, Kichemsha maji cha kati
Vifaa vya ujenzi Saruji
Nyenzo za paa Karatasi za chuma
Vifaa vya fakedi Elementi ya saruji
Marekebisho Zingine 2026 (Itaanza siku karibuni)
Dreineji ya chini 2026 (Itaanza siku karibuni), Rain water management and drainage ditches, assessment and planning of renovation needs.
Paa 2026 (Itaanza siku karibuni), Renovation of roofs at Isonvillasaarentie 10, Haapasaarentie 5, and Neitsytsaarentie 9b. The general meeting on December 15, 2025 authorized the board to order the replacement of the roofs at a maximum cost of €924,438.90 (approximately €27.22/m²), with a loan period of 10 years.
Roshani 2025 (Imemalizika), Haapasaarentie 5 and 9 balcony railing repairs (balconies without glass). 2023 Isonvillasaarentie 10 balcony sill repairs and balcony cladding. 2022 Neitsytsaarentie 1 balcony sill repairs and balcony cladding. 2021 Balcony railing repairs, railing cladding and facade painting: Neitsytsaarentie 7a and 7 b. 2020 Balcony railing repairs and cladding: Neitsytsaarentie 9 a and 9 b. 2006-2007 Isonvillasaarentie 8 and 12 and Haapasaarentie 7 and 11: metal cladding of railings on unglazed balconies.
Mpango wa ukarabati 2025 (Imemalizika), The Board's maintenance needs assessment for 2025–2034. When reading about the renovations, please note that the housing company is exceptionally large, comprising 17 buildings, 661 apartments, and a total floor area of 33,967 m².
Paa 2025 (Imemalizika), Roof replacement: Isonvillasaarentie 6, Haapasaarentie 1, and Neitsytsaarentie 9a. 2023 Replacement: Haapasaarentie 11, Neitsytsaarentie 3, and 5. Painting: Isonvillasaarentie 2 and Haapasaarentie 7. 2021 Painting of the roof at Haapasaarentie 9. 2020 Roof replacement at Haapasaarentie 7 and Neitsytsaarentie 1. Painting of the roof at Isonvillasaarentie 12. 2018 Replacement of the upper part of the roof at Isonvillasaarentie 12. Isonvillasaarentie 2 roof replacement. 2017 Haapasaarentie 9 roof replacement. 2015 Isonvillasaarentie 12 roof replacement and attic wall replacement. 2014 Neitsytsaarentie 1 and 9 b roof coating.
Kupashajoto 2024 (Imemalizika), Replacement of all expansion tanks, Ivst 2 and 12 circulation pumps. 2001-2005 Replacement of heat distribution centers in all buildings.
Fakedi 2024 (Imemalizika), Hst 7 washing and painting. 2023 Ivst 12 washing of balcony-side facades. Hst 1, Ivst 10 repairing, washing, and painting of plinths and gables.
Zingine 2023 (Imemalizika), Installation of safety valves in distribution centers. Replacement of motor valves on the domestic water side. Repair of the connection point of the underground sewer at Haapasaarentie 11. Replacement of domestic water pipes in the middle apartments (bathroom/kitchen) of Nst 3 B. 2022 Installation of water-saving products. Installation of smart thermostats. 2011 Addition of cellulose insulation to the attics of all buildings (except Ivst 12 and Hst 11, due to their attics). 2009 Replacement of unrenovated water pipes in Hst 1 and Ivst 2 as well as Nst 5, 7a, 7b in connection with pipe renovation.
Siwa za maji taka 2023 (Imemalizika), Repair of the connection point of the Hst 11 underground sewer. 2020 Nst 1, 3, and 5, cleaning and imaging of sewage sewers.
Maeneo ya kawaida 2023 (Imemalizika), Renovation of the sauna at Isonvillasaarentie 8. 2022 Renovation of the sauna at Isonvillasaarentie 12. Painting of the basement corridor and improvement of lighting at Haapasaarentie 11. Repairs to cold storage equipment. 2021 Painting and improving lighting in the basement corridors and bicycle storage rooms at Isonvillasaarentie 6, renovation of the sauna.
Uwanja 2023 (Imemalizika), Urgent repairs to playgrounds based on inspection. Felling of trees according to tree condition assessment. 2011 Repaving of the front yard at Haapasaarentie 11 and addition of two new visitor parking spaces. 2009 Addition of rainwater drains between the buildings at Haapasaarentie 1 and 5. 2005-2006 Repaving of the yards at Isonvillasaarentie 8 and 10 and Haapasaarentie 7.
Uingizaji hewa 2023 (Imemalizika), Repair of exhaust fans in common areas (washrooms, saunas, etc.) and replacement of timers. 2003-2007 Cleaning of ventilation ducts in all buildings.
Madirisha 2022 (Imemalizika), Renovated windows, except for balcony windows and doors: Haapasaarentie 5, 2021 Isonvillasaarentie 6 and 2, 2020 Haapasaarentie 1 and 9. Renovation of apartment and basement windows on the west side of Isonvillasaarentie 10. Renovated windows except for balcony windows and doors: 2018 Neitsytsaarentie 7 a, 7 b and 9 b, Isonvillasaarentie 12, 2017 Haapasaarentie 11 and 2016 Neitsytsaarentie 9 a, 2012-2013 Neitsytsaarentie 1, 2011 Isonvillasaarentie 8, Haapasaarentie 7. 2010 Replacement of windows on the south side of Neitsytsaarentie 7 a and 7 b. Renovation of windows on the east side: 2009 Haapasaarentie 5 and Neitsytsaarentie 5, 2008 Isonvillasaarentie 10 and Neitsytsaarentie 3, 2007 Renovation of windows on the east side: Isonvillasaarentie 6 and Haapasaarentie 9 and Neitsytsaarentie 5: replacement of windows on the west side of the facade. 2006 Replacement of windows on the front yard side of Isonvillasaarentie 2 and Haapasaarentie 1. 2005 Replacement of windows in 16 window openings at Neitsytsaarentie 3.
Vifuli 2021 (Imemalizika), Lock replacement with Iloq S5 system and readers installation.
Bomba 2003 (Imemalizika), -2006 During pipe renovation, domestic water pipes and sewers were replaced with a hybrid model (sleeving/replacement). Replacement of electrical panels in apartments.
Maeneo ya kawaida Hifadhi ya vifaa, Sauna, Chumba cha kukausha, Sela la baridi, Chumba cha kufua
Meneja Retta Isännöinti Oy
Maelezo ya mawasiliano ya meneja Kaisa Dabnell p. 010 228 2000
Matengenezo Vuo-Kiinteistöpalvelut Oy.
Eneo la loti 87975 m²
Namba ya kuegesha magari 469
Namba ya majengo 17
Eneo la ardhi Flati
Barabara Ndio
Umiliki wa ardhi Miliki
Hali ya kupanga Mpango yenye Maelezo
Uhandisi wa manispaa Maji, Maji taka, Umeme, Inapokanzwa kwa wilaya

Darasa la cheti cha nishati

D

Huduma

Duka ya mboga 0.4 km , S-Market Vuosaari
 
Kituo cha ununuzi 1.5 km , Columbus Shopping Mall

https://columbus.fi/  
Kilabu cha afya 1.6 km , Sport Center

https://www.urheiluhallit.fi/hallit/vuosaari/  
Mbuga 0.2 km , Park
 
Shule 0.8 km , Vuosaari Elementary School
 
Shule ya chekechea 0.6 km , Koralli Daycare Center
 
Kituo ca afya 1.5 km , Healthcare Center
 

Upatikanaji wa usafiri wa umma

mfumo wa reli ya chini ya ardhi 1.5 km , Vuosaari metro station
 
Basi 0.3 km , Bus stop
 

Ada za kila mwezi

Maji 22 € / mwezi (65,451.89 TSh) / mtu