Kondomu, Liisantie 1
90560 Oulu, Koskela
Tafadhali wasiliana na mwakilishi wa mauzo kwa maelezo zaidi juu ya mali hii.
Ada ya kukodi
1,100 € / mwezi (3,226,188 TSh)Vyumba
4Vyumba vya kulala
3Bafu
1Mahali pa kuishi
105 m²Wasiliana nasi
Jaza ombi la kukodisha mali hii mapema.
Ninavutiwa na kukodisha mali hii
Tuma ombi la kukodishaAsante kwa ombi lako la kuwasiliana. Tutawasiliana nawe mara moja!
Maelezo ya kimsingi
| Namba ya kuorodhesha | 671773 |
|---|---|
| Ada ya kukodi | 1,100 € / mwezi (3,226,188 TSh) |
| Muda wa mkataba | Isiyo na mwisho |
| Mkataba unaanza | 26 Jan 2026 |
| Amana | € 2,200 (TSh 6,452,375) |
| Kuvuta sigara inakubalika | Hapana |
| Peti zinaruhusiwa | Hapana |
| Vyumba | 4 |
| Vyumba vya kulala | 3 |
| Bafu | 1 |
| Vyoo | 2 |
| Bafu pamoja na choo | 1 |
| Mahali pa kuishi | 105 m² |
| Vipimo vimehalalishwa | Hapana |
| Vipimo vimepimwa na | Nakala ya chama |
| Sakafu | 1 |
| Sakafu za makazi | 1 |
| Hali | Nzuri |
| Nafasi kutoka kwa | 26 Jan 2026 |
| Nafasi |
Chumba cha kulala
Sebule Jikoni Bafu Msalani Roshani iliong’aa |
| Hifadhi | Kabati , Chumba cha msingi cha uhifadhi |
| Mawasiliano ya simu | Mtandao wa kebol, Antena |
| Nyuso za sakafu | Lamoni, Taili |
| Nyuso za ukuta | Karatasi ya ukuta, Rangi |
| Nyuso za bafu | Taili |
| Vifaa vya jikoni | Stovu la induction , Jokofu la friza, Kabati, Hudi la jikoni, Mashine ya kuosha vyombo, Oveni tofauti, Microwevu |
| Vifaa vya bafu | Shawa, Kiunganishi cha mashine ya kuosha , Nafasi ya mashine ya kuosha, Kabati, Sinki, Ukuta wa shawa, Kiti cha msalani, Kioo, Kabati yenye kioo |
| Hisa | 232265-238184 |
Maelezo ya ujenzi na mali
| Mwaka wa ujenzi | 1970 |
|---|---|
| Uzinduzi | 1970 |
| Sakafu | 3 |
| Lifti | Hapana |
| Aina ya paa | Paa ya kivuli |
| Uingizaji hewa | Uingizaji hewa wa asili |
| Msingi | Saruji |
| Darasa la cheti cha nishati | D , 2018 |
| Kutia joto | Kutia joto kwa wilaya, Kichemsha maji cha kati, Radi |
| Vifaa vya ujenzi | Matofali, Saruji |
| Nyenzo za paa | Kujaza |
| Vifaa vya fakedi | Saruji, Kazi ya matofali ya upande |
| Marekebisho |
Vifuli 2025 (Imemalizika) Zingine 2024 (Imemalizika) Zingine 2023 (Imemalizika) Paa 2022 (Imemalizika), the water roofing material of all three residential buildings was changed to bituminous core roofing, previously they were machine seam sheets. At the same time, additional thermal insulation of the upper floor was added, and the ventilation of the upper floor was improved by raising the roof approx. 25 cm and adding vacuum fans. In house III, a fire break was added to the upper floor. The fire breaks on the upper floors of other houses were sealed. All roofs have official roof safety equipment. Maeneo ya kawaida 2020 (Imemalizika), the walls and floors of the basement corridors are painted. Zingine 2019 (Imemalizika), basement end exterior doors to all houses, end canopies to houses II and III, coating repair of stairs and floors of end canopies, sauna repairs (house III), painting of basement corridor to house I, gutter heating to houses III Roshani 2016 (Imemalizika), surface repairs of balcony floors Siwa za maji taka 2015 (Imemalizika), Repair of the sewer leak in apartments A1 and A2 in A- crab. The drains of all apartments have been renovated using the injection molding method. The upper parts of the ventilation drains have been renovated. The bottom drain is plastic, so the renovation did not touch it. Zingine 2013 (Imemalizika), Surface installations of domestic water, water meters for the apartments, new electricity (including main centers + apartment centers and new supply cable for the stove + act boxes cabling), painting + lighting, carpeting, new lights in the basements and new radiator thermostats + balancing of the heating network. Removal of tree stumps from grassy areas, asphalt in front of building III renewed. Zingine 2011 (Imemalizika), 2010 snow barriers, improvement of yard lighting, own broadband, heat exchanger packages for each building (three buildings). Zingine 2011 (Imemalizika), renovation of brick seams, ventilation duct cleaning Zingine 2010 (Imemalizika), snow barriers, improvement of yard lighting, own broadband, heat exchanger packages for every house Zingine 2009 (Imemalizika), renovation of the roofs in house 1 and 3 by partially renewing and repairing and painting the old one, in house 2 a completely new tin roof and new underlayment, J-stair pipes to the surface + water meters Zingine 2007 (Imemalizika), own antenna system Paipu za maji 2004 (Imemalizika), The service water of the E-crab is installed on the surface Zingine 2003 (Imemalizika), The sauna sections of houses 1 and 2 have been repaired Zingine 2002 (Imemalizika), The sewers of the 2nd and 3rd houses have been renewed, Molok waste collection containers Roshani 2001 (Imemalizika), the balconies of the apartments have been repaired Zingine 1999 (Imemalizika), windows and balcony doors renewed, canopies of the entrances Uwanja 1995 (Imemalizika), asphalt repairs Maeneo ya kawaida 1994 (Imemalizika), paintings of stairwells |
| Maeneo ya kawaida | Hifadhi ya vifaa, Sauna, Makao ya uvamizi - hewa, Chumba cha kukausha, Chumba cha kilabu |
| Meneja | Retta Isännöinti Oy |
| Maelezo ya mawasiliano ya meneja | Kari Myllyoja p. 010 228 8407 |
| Matengenezo | Huoltoliike |
| Eneo la loti | 17973 m² |
| Namba ya kuegesha magari | 74 |
| Namba ya majengo | 3 |
| Eneo la ardhi | Flati |
| Barabara | Ndio |
| Umiliki wa ardhi | Kupangisha |
| Mwenye kiwanja | Oulun kaupunki lisätiedot p. 08 5584 3500. |
| Mkataba wa kukodisha unaisha | 31 Des 2054 |
| Hali ya kupanga | Mpango yenye Maelezo |
| Uhandisi wa manispaa | Maji, Maji taka, Umeme, Inapokanzwa kwa wilaya |
Darasa la cheti cha nishati
Huduma
| Shule | 0.5 km |
|---|---|
| Shule ya chekechea | 0.6 km |
Ada za kila mwezi
| Maji | 15 € / mwezi (43,993.47 TSh) / mtu |
|---|---|
| Nafasi ya kuegeza gari | 12 € / mwezi (35,194.77 TSh) |