Menu Menu
Xir

Ku raadi lambarka tixraaca

Guriga magaalada, Seilikaari 14

02180 Espoo, Mankkaa

Two-level terraced house in Mankkaa

Located in Mankkaa, Espoo, the terraced house offers functional spaces for a wide variety of everyday life. The actual living area is 115.5 m² and in addition there is about 41 m² of warm space on the ground floor.

The living room is spacious and bright and has a high sloping ceiling. From the living room, access to the gated west-facing backyard of the apartment, whose terrace has been renovated in 2024.

The open kitchen and dining area form a coherent whole with the living room. The kitchen was renovated in 2014 and the parquet floor upstairs has recently been sanded.

The home's practicality is enhanced by ample storage spaces, two toilets, a sauna and a clean bathroom. The fireplace room downstairs adds flexibility to the use of spaces.

The apartment has a carport with the possibility of charging an electric car.

Mankaa is a quiet and popular residential area with good transport links, schools and kindergartens nearby. Services can be found in both Mankka and Tapiola.

For further information and requests for presentations, Riikka tel. +358 50 4200105

Lea Aaltonen

English Finnish French
Wakiilka guryaha
Habita Helsinki
Aqoonta hantida maguurtada ah ee Finland
Qiimaha iibka aan la jabin
€398,000 (S 267,995,317)
Qolal
4
Qolalka jiifka
2
Musqulaha
1
Deegaanka lagu noolaado
115.5 m²

Faahfaahinta aasaasiga ah

lambarka liiska 671253
Qiimaha iibka aan la jabin €398,000 (S 267,995,317)
Qiimaha iibka €398,000 (S 267,995,317)
Qolal 4
Qolalka jiifka 2
Musqulaha 1
Musqulaha 1
Musqulo leh musqul 1
Deegaanka lagu noolaado 115.5 m²
Guud ahaan aagga 156.5 m²
Aagga boosaska kale 41 m²
Sharaxaada meelaha lagu noolaado Living room, kitchen, two bedrooms, bathroom/WC, sauna, separate WC, entrance hall.
Sharaxaada meelaha kale Fireplace room and two additional rooms.
Sharaxaada aagga According to the Articles of Association: 4 rooms + kitchen + sauna, 115.5 m². Other floor area approx. 41 m² of heated space, based on the seller’s information.
Cabbiraadaha la xaqiijiyay Maya
Cabbiraadaha ku salaysan Shahaadada maamulaha guriga
Dabaq 1
Dabaqyada deegaanka 2
Xaalad Wacan
Shaqo ka banaan Instantly free
Dhigashada Carport, Barta ku dallaca gaariga korontada
Astaamaha Bamka kulaylka isha hawada, Goobta dabka lagu shido
Goobaha Qolka fadhiga
Qolka jiifka
Jikada furan
Musqusha
Barxadda
Qolka musqusha
Sauna
Qolka dabka lagu shido
Qolka hiwaayadda
Muuqaalo Dayrka, Xaafadda
Kaydinta Golaha Wasiirada, Armaajooyinka / armaajooyinka, Kaydinta dibadda, Armaajo-in
Isgaarsiinta anteeno
Dusha sare Parquet , foorno, Dabaqa Vinyl
Dusha darbiga Warqad gidaar ah, Rinjiyeynta
Meelaha musqusha foorno
Qalabka jikada Shooladda wax-soo-saarka, Qaboojiyaha, Qaboojiyaha, Golaha Wasiirada, Daboolka jikada, Makiinada weelka lagu dhaqo, Foornada goonida ah, Microwave
Qalabka musqusha Qubeyska, Isku xirka mashiinka dharka, Kuleylinta dabaqa hoose, Booska mashiinka dharka lagu dhaqo, Qubeyska Bidet, Golaha Wasiirada, Dhuuqso, gidaarka qubeyska, Kursiga musqusha, Muraayad
Kormeero Qiimaynta xaaladda (09-Abr-2020)
sahanka asbestos Dhismaha ayaa la dhisay ka hor 1994-kii, sahan asbestos ah lama samayn.
Saamiyada 731 - 846
Sharaxaada 4 rooms, kitchen, bathroom/wc, sauna and wc

Faahfaahinta dhismaha iyo hantida

sanadka dhismaha 1981
Caleemo saarka 1981
Dabaqyada 2
Kor u qaad Maya
Nooca saqafka Saqafka goglan
Hawo-qaadid Hawo dabiici ah
fasalka shahaadada tamarta E, 2018
Kululaynta Kuleylinta korontada, Shucaaciyaha
Qalabka dhismaha Qoryo
Qalabka saqafka Dareemay
Qalabka wejiga Dabaqyada lebenka
Dib u habeyn Plinth 2024 (La sameeyay), Replacement and insulation of the foundation drainage system and the exterior surfaces of the foundation of Building 2, as well as reinforcement of the upper end foundation structure with an additional foundation constructed beneath the original one. 2006 Renewal of the foundation drainage system of Building 1, thermal insulation of the ground floor structure with Styrofoam boards, and installation of an automatic drainage water pump beneath Apartment 1. Installation of drainage membrane (dimple board) on the upper end of Building 2.
Mid kale 2024 (La sameeyay), Repair of moisture damage in the floor slab of the basement storage room of Apartment 10. 2012 Repair of wall leakage points in Apartments 9 and 10.
Dayrka 2024 (La sameeyay), Renewal of the courtyard terraces of Apartments 7–10 and restoration of the yards following the drainage works. Replacement of the decking boards of the front and rear entrance staircases.
Bulaacadaha 2024 (La sameeyay), Repair of the drainage pipes damaged by ground settlement in the subfloor area near Apartments 3–4.
Jaranjarada 2024 (La sameeyay), Replacement of the entrance stair decking boards of Building 2.
Qorshaha dib u cusboonaysiinta 2024 (La sameeyay), Maintenance Needs Plan 2025–2029 (5 May 2025)
Mid kale 2023 (La sameeyay), Repair of moisture damage to the floor in the fireplace room of Apartment 8. Internal repairs to the ground-contact walls on the lower floor of Apartments 7, 9, and 10. Moisture and microbial inspections of the lower-floor floors and ground-contact walls in Apartments 7, 9, and 10. 2022 Internal repairs to the ground-contact walls on the lower floor of Apartment 7. Repair of moisture damage to the lower-floor surface in Apartment 8 and replacement of the floor finish with a breathable material. 2021 Internal repairs to the ground-contact walls on the lower floor of Apartment 8 (removal of internal thermal insulation, grinding of concrete blocks, and application of a breathable coating).
Dhigashada 2021 (La sameeyay)
Saqafka 2020 (La sameeyay), Installation of electric vehicle charging stations in the carport (including a new power supply cable and a new main electrical distribution board for the carport).
Dayrka 2018 (La sameeyay), Cladding of the yard fences with top boards and spot painting of the fences. 2007 Renewal of the yard fences.
Mid kale 2017 (La sameeyay), Replacement of soil and installation of crushed stone in the subfloor of Building 1.
Kululaynta 2015 (La sameeyay), Replacement of ceiling heating with radiators.
Hawo-qaadid 2013 (La sameeyay), Cleaning of ventilation ducts. 2012 Installation of replacement air vents in all apartments. Installation of roof exhaust fans above Apartments 4 and 5.
Korontada 2013 (La sameeyay), Inspection and maintenance of the main electrical distribution board and the sub-distribution boards.
waji 2007 (La sameeyay), Painting of the wooden parts of the exterior walls. 1998 Painting of the wooden parts of the exterior walls and eaves.
Meelaha la wadaago Kaydinta qalabka
Maareeyaha Kontu Oy, Soili Vuorinen p. 010 4118100
Macluumaadka xiriirka maamulaha soili.vuorinen@kontuoy.fi
Dayactirka Omatoiminen. Lumityöt ja hiekoitus ulkopuolinen yhtiö.
Dhul badan 3998 m²
Tirada meelaha baabuurta la dhigto 12
Tirada dhismayaasha 2
Dhulka fidsan
Waddada Haa
Lahaanshaha dhulka Leh
Xaalada qorshaynta Qorshe faahfaahsan
injineernimada degmada Biyo, Bullaacad, Korontada

fasalka shahaadada tamarta

E

Faahfaahinta iskaashiga guryeynta

Magaca iskaashiga guryeynta Asunto Oy Mankkaankoti
Tirada saamiyada 962
Tirada guryaha 10
Aagga guryaha 957 m²
Dakhliga kirada sanadka 2,000
Xaqa madax furashada Maya

Kharashka bishii

Dayactirka 277.2 € / bisha (186,654.02 Sh.So.)
Kharashka dayactirka 231 € / bisha (155,545.02 Sh.So.)
Biyo 15 € / bisha (10,100.33 Sh.So.)
Korontada 200 € / bisha (134,671.01 Sh.So.) (qiyaas)

Qiimaha iibka

Canshuurta wareejinta 1.5 %
Kharashyada diiwaangelinta €92 (S 61,949) (Qiyaas)

Sidan ayuu ku bilaabmaa gadashada hantidaada

  1. Buuxi foomka gaaban waxaan qabanqaabin doonaa kulan
  2. Wakiilkayaga ayaa kula soo xidhiidhi doona dib u dhac la'aan waxaanu qabanqaabin doonaa kulan.

Ma jeclaan lahayd inaad wax badan ka ogaato gurigan?

Khalad ayaa dhacay markii la isku deyayay in la diro codsiga xiriirka Fadlan isku day mar kale

Soodejinaya

Waad ku mahadsan tahay codsigaaga xiriirka Waanu kula soo xidhiidhi doonaa isla markiiba!