Carnikavas 3c
1034 Riga, Mīlgrāvis
The building can be used in various ways, for example: office, administration, hotel, production, apartments, rental house, online casino, etc.
It is possible to carry out combined use, for example: warehouse or production on the 1st floor, offices and administration on the 2nd or 3rd floor, hotel/apartments on the 4th and attic floor.
If necessary, the hotel project has been coordinated, the first building permit has been received.
The building was built in 1959: reinforced concrete foundations, brick walls, concrete floors between floors. The building has two staircases, an assembly hall. Elevators can be installed.
All city communications: water, sewage, gas, electricity, optical internet.
The building is vacated and ready for renovation.
Osnovni detalji
| Broj objave | 670332 | 
|---|---|
| Prodajna cijena | 530.000 € (1.036.088 KM) | 
| Vrste | Ured, Trgovački prostor, Izložba, Skladište, Proizvodni pogon, Radni prostor, Logistika, Prostor za njegu, Smještaj | 
| Kat | 4 | 
| Katovi poslovnog prostora | 4 | 
| Ukupna površina | 3722 m² | 
| Opis površine | The building can be used in various ways, for example: office, administration, hotel, production, apartments, rental house, online casino, etc. It is possible to carry out combined use, for example: warehouse or production on the 1st floor, offices and administration on the 2nd or 3rd floor, hotel/apartments on the 4th and attic floor. If necessary, the hotel project has been coordinated, the first building permit has been received. Building area - 3180.1 m2. Attic floor area - 542.09 m2 (over one part of the building). Total building area - 3722.19 m2. Land area - 2791 m2. Ceiling height: 1st floor - 3.00 meters. 2nd floor - 3.50 meters. 3rd floor - 3.60 meters. 4th floor - 3.80 meters. 5th attic floor - 4.50 meters. Ceiling height in the assembly hall - 5.20 meters. The building was built in 1959: reinforced concrete foundations, brick walls, concrete floors between floors. The building has two staircases and an assembly hall. Elevators can be installed. ss.com All city utilities: water supply, sewage, gas, electricity and optical internet. | 
| Mjere provjerene | Da | 
| Izvor mjera | Arhitektonski projekt | 
| Stanje | Potrebna obnova | 
| Slobodno od | Prema ugovoru | 
| Opis | Combined use is possible | 
Podaci o zgradi i nekretnini
| Godina izgradnje | 1959 | 
|---|---|
| Početak uporabe | 1959 | 
| Katovi / etaže | 4 | 
| Dizalo | Ne | 
| Ventilacija | Prirodna ventilacija | 
| Temelji | Beton | 
| Razred energetskog certifikata | Energetski certifikat nije propisan zakonom | 
| Građevinski materijali | Cigla, Beton | 
| Fasadni materijali | Elementi od betona | 
| Obnove | Krov 2022 (Gotovo) | 
| Broj parkirnih mjesta | 10 | 
| Broj zgrada | 1 | 
| Zemljište | Ravna konfiguracija | 
| Cesta | Da | 
| Vlasništvo zemlje | Vlastito | 
| Planiranje | Detaljan plan | 
| Komunalna infrastruktura | Voda, Kanalizacija, Struja | 
Mjesečne naknade
| Ostalo | 500 € / mjesec (977,44 KM) (procjena) | 
|---|
Naknade
| Porez | 1,5 % | 
|---|
Ovako počinje kupnja vaše nekretnine
- Ispunite kratku formu i dogovoriti ćemo sastanak
 - Naš predstavnik će Vas kontaktirati bez odlaganja i dogovoriti sastanak.
 
Želite li znati više o ovoj nekretnini?
Zahvaljujemo na zahtjevu za kontakt. Kontaktirati ćemo vas ubrzo!